Back to Services

03 / Engineering Delivery

A small batch that proves the line before the big one.

Pilot Run & QA Plan

The first hundred units run through the real line with the real inspection plan attached.

What you get

  • Inspection plan with AQL levels per station
  • Fixture and gauge list handed to QC
  • Pilot report with the fixes made before scale-up

Handover leaves behind documents, fixtures and a trained contact, not a phone number.