Back to Services
02 / Mechanical & Structural
Wall thickness, ribs and screw bosses decided early.
The load paths and part count are settled before anyone models a cosmetic surface in detail.
What you get
- Assembly architecture with a fixed part count
- Rib, boss and wall schedule per shell
- Fastener and snap plan with assembly sequence
Structural decisions are documented with the test that proves them, not with an opinion.